Call Us Today:(+86) 153-0260-2812
ALL PRODUCTS
AIR FILTERS
Fan Filter Unit HEPA Filter Air Filters And Housing Carbon Filter Projector Air Filters
CLEAN ROOMS
Engineering Project Cleanroom Air Shower Air Shower Tunnel Clean Room Booth Air Shower Pass Box Laminar Flow Cabinet Sandwich Panels Cleanroom Doors &Window Stainless Steel Devices Air Diffusers Air Louvers
Customer Reviews
We have purchased 4 roller shutter doors for our candy factory,very fast delivery and good quality .customer is very satisfied.
—— Mr Anderson
We have been keeping a good contact for years, we visited them after the approval of our cleanroom construction apply, they quickly updated the detailed offer and drawing after talked. the completion is great and as proposed. We choose alpha clean again for our new plants cleanroom constructor.
—— Mr Mariefe
Very good HEPA filters for our pharmaceutical plant,we will purchase from you next time.
—— Mr mohammed
Newsletter

About the latest offers and deals Subscribe today!

Cleanroom Design

Make a budgetary quote for your clean room project by identifying your needs and objectives, the regulations and classification requirements, the general technical specifications and any other requirements.

Cleanroom ceiling ,doors, flooring ,mechanical system,HVAC system and so on ,all these should be evaluated.

We will design your cleanroom and qualify the design (DQ) to meet your requirements (URS), and the detailed cleanroom and HVAC drawings will be approved at your end.

Production

Alpha clean modular cleanrooms are built with modular panels and prefabricated in our own factory .

Alpha clean is not only the cleanroom turnkey solution provider ,but also a manufacturer of the main clean room products of cleanroom air showers,pass throughs,clean benches, doors and windows,stainless steel furnitures etc.

From material procurement to testing prior to shipment ,the entire production process is strictly executed by our professionals in compliance with accepted international standards.

We remain committed to guarantee the performance of our products ,customer satisfaction

Construction & Installation

The clean room project construction needs to be comprehensively considered based on the actual situation, and then comply with relevant standards and specifications, and formulate the construction plan according to the specific detailed construction drawings. The entire purification project construction process is carried out step by step to ensure that the clean workshop construction quality can meet the requirements. , to ach ieve the desired results.

Clean Room Engineering Construction Process

Finally, the supplier needs to provide a clean room maintenance manual, training materials and training records, spare parts list, the first cleaning test record, the owner completes the clean room usage log as an attachment to IQ.

After the clean room IQ report is approved, it indicates that the clean room system has been confirmed and the certificate can be put into use. This is also an important milestone in the project.

Commissioning & Validation

To ensure the cleanroom is working properly ,commissioning and testing will be done before the application for acceptance is qualified .

cleanroom testing can be done in three timings which are completed, in standby, and in operation. Not every test item needs to be tested at three points in time, but depending on its type and design needs.

Completion Test

It means that the clean room and all related support facilities have been completed and operational, but the production equipment and personnel have not entered the site.

Standby (Static) Test

It means that the clean room has been completed, the production equipment has been installed and is operational, but the personnel have not yet entered the site.

In Operation (Dynamic) Test

All cleanroom relevant support facilities and personnel have entered and are in normal operation.

Cleanroom testing programs may include the followings

  • Wind speed, air volume and uniformity test
  • Airflow parallelism test
  • Suspended particle count test
  • Bacteria colony count test
  • Temperature and humidity test
  • Room differential pressure test
  • Dust-free zone integrity test
  • Filter leakage test
  • Reply test
  • Noise test
  • Vibration test
  • Illumination test
 

WHAT KIND OF CLEAN ROOM PLANNING AND DESIGN PLAN MEETS THE BEST PROCESS REQUIREMENTS?

The most energy efficient

Low investment and low operating costs

Contact us today for any of your cleanroom budgeting and planning needs