Cleanroom Design
-
Make a budgetary quote for your clean room project by identifying your needs and objectives, the regulations and classification requirements, the general technical specifications and any other requirements.
Cleanroom ceiling ,doors, flooring ,mechanical system,HVAC system and so on ,all these should be evaluated.
We will design your cleanroom and qualify the design (DQ) to meet your requirements (URS), and the detailed cleanroom and HVAC drawings will be approved at your end.
Production
-
Alpha clean modular cleanrooms are built with modular panels and prefabricated in our own factory .
Alpha clean is not only the cleanroom turnkey solution provider ,but also a manufacturer of the main clean room products of cleanroom air showers,pass throughs,clean benches, doors and windows,stainless steel furnitures etc.
From material procurement to testing prior to shipment ,the entire production process is strictly executed by our professionals in compliance with accepted international standards.
We remain committed to guarantee the performance of our products ,customer satisfaction
Construction & Installation
-
The clean room project construction needs to be comprehensively considered based on the actual situation, and then comply with relevant standards and specifications, and formulate the construction plan according to the specific detailed construction drawings. The entire purification project construction process is carried out step by step to ensure that the clean workshop construction quality can meet the requirements. , to ach ieve the desired results.
Clean Room Engineering Construction Process
Finally, the supplier needs to provide a clean room maintenance manual, training materials and training records, spare parts list, the first cleaning test record, the owner completes the clean room usage log as an attachment to IQ.
After the clean room IQ report is approved, it indicates that the clean room system has been confirmed and the certificate can be put into use. This is also an important milestone in the project.
Commissioning & Validation
-
To ensure the cleanroom is working properly ,commissioning and testing will be done before the application for acceptance is qualified .
cleanroom testing can be done in three timings which are completed, in standby, and in operation. Not every test item needs to be tested at three points in time, but depending on its type and design needs.
Completion Test
It means that the clean room and all related support facilities have been completed and operational, but the production equipment and personnel have not entered the site.
Standby (Static) Test
It means that the clean room has been completed, the production equipment has been installed and is operational, but the personnel have not yet entered the site.
In Operation (Dynamic) Test
All cleanroom relevant support facilities and personnel have entered and are in normal operation.
Cleanroom testing programs may include the followings
- Wind speed, air volume and uniformity test
- Airflow parallelism test
- Suspended particle count test
- Bacteria colony count test
- Temperature and humidity test
- Room differential pressure test
- Dust-free zone integrity test
- Filter leakage test
- Reply test
- Noise test
- Vibration test
- Illumination test
WHAT KIND OF CLEAN ROOM PLANNING AND DESIGN PLAN MEETS THE BEST PROCESS REQUIREMENTS?
The most energy efficient
Low investment and low operating costs
Contact us today for any of your cleanroom budgeting and planning needs